Double Mast Aerial Work Platform in Vadodara

Double Mast Aerial Work Platform in Vadodara

Aerial Work

220 Kg x 10 Metre (All Size Available)

Rs. 3,10,000

(Taxes to be paid extra)

Brand: SRE
SKU: SRE 152
Min Order Qty: 1

Factory maintenance teams and construction fit-out contractors in Vadodara, Ahmedabad, and Pune that need to work at heights between 8 and 10 metres — for ceiling structure maintenance, overhead crane beam inspection, high-bay racking installation, or MEP work near the roof line of large production halls — quickly discover that a single mast aerial work platform rated at 6 metres is insufficient, and that hired scaffolding at Rs. 15,000–25,000 per day is too expensive for weekly maintenance tasks. The Double Mast Aerial Work Platform in Vadodara (SKU: SRE 152) is the correct solution for this height range: a battery-powered, dual-mast elevated work platform rated at 220 kg with a 10-metre maximum working height, priced at Rs. 3,10,000. The dual mast configuration provides the structural rigidity and load capacity necessary for two-person operation, heavy tool use, and long-duration maintenance tasks at heights that a single mast cannot safely serve — making it the standard height-access choice for process plants, high-bay warehouses, and large-span factory buildings across Gujarat, Maharashtra, and Rajasthan.

“We run a 22,000 sq.m. production hall in Vadodara with 9-metre-high overhead crane runways, lighting trusses, and cable tray systems. Maintaining these was a scaffolding nightmare — Rs. 22,000 per day for a 3-man scaffold crew for every job above 6 metres. After deploying 2 SRE 152 double mast AWPs, our own 2-person maintenance team handles all overhead work at their own schedule. Scaffold budget eliminated entirely for routine maintenance.” — Maintenance Manager, Heavy Engineering Plant, Vadodara Waghodia GIDC (Client Testimonial, 2025)

Why a Double Mast Design Is Necessary Above 6 Metres — Structural and Safety Rationale

The structural case for double mast design above 6 metres is straightforward: at 10-metre elevation, the cantilever moment at the mast base from a side-loaded platform (operator reaching sideways, tool exerting lateral force, or wind load in semi-outdoor applications) is approximately 3.5× greater than at 6 metres for the same load. A single mast column — even a heavy-gauge one — must be sized significantly larger to resist this bending moment without deflection at the platform level. The double mast design distributes the platform’s vertical and lateral loads across two parallel mast columns braced together, reducing the effective cantilever arm at each column by 50% and allowing the platform to maintain ±5 mm positional stability at 10 metres under rated load — versus ±15–25 mm typical for single mast designs extrapolated beyond their rated height.

For maintenance teams in Vadodara‘s heavy engineering, chemical, and auto-component plants, the stability improvement at height is not just a structural specification — it directly affects work quality. Pipe insulation fitting, conduit bending, and structural bolt torquing at 9–10 metres all require platform stability within a few millimetres: a deflecting platform causes the operator to expend effort on balance rather than the task, slowing work and increasing fatigue-related error rate. The SRE 152 double mast AWP delivers this stability at full 220 kg rated load — sufficient for two operators with tools at 10 metres — through its IS 2062 Grade A MS steel twin mast assembly with precision-machined rack-and-pinion drive and outrigger stabilisers that deploy automatically at mast extension beyond 6 metres. SRE Material Handling Equipment Pvt. Ltd., an ISO 9001:2015 certified manufacturer, conducts a load test at 125% rated capacity (275 kg) at 10-metre height before dispatch on every unit supplied to industrial buyers in Gujarat, Maharashtra, and Rajasthan.

Industry Applications of the Double Mast AWP in Vadodara and Across India

  • Heavy Engineering & Fabrication Plants: Overhead crane runway beam inspection, gantry structure maintenance, and roof-level structural welding in Vadodara, Bhavnagar, Faridabad, and Ambala heavy engineering yards.
  • Chemical & Process Plants: Elevated pipe rack inspection, insulation repair, pressure gauge calibration at 8–10 metre elevations in Vadodara Petrochemicals Complex, Ghandhidham, Kutch, and Vatva GIDC.
  • High-Bay Warehouses: Rack installation at 9–10 metre height, sprinkler head inspection, LED lighting replacement in 3PL warehouses in Noida, Gurugram, Bangalore, and Chennai.
  • Construction & Building Fit-Out: MEP installation, false ceiling at 9-metre heights, facade painting, and glass installation in commercial construction in Bhopal, Indore, Jaipur, and Udaipur.
  • Auto-Component & Assembly Plants: Overhead conveyor maintenance, roof exhaust fan servicing, and compressed air line repairs in production halls in Pune, Gurugram, and Rohtak.
  • Pharma & Healthcare Facility Management: Elevated HVAC duct access, ceiling panel maintenance, and fire suppression system inspection in multi-storey pharma plant buildings in Ahmedabad and Hyderabad.
  • Utility & Power Infrastructure: Overhead cable tray access, switchgear room maintenance at elevated busbars, and transformer hall inspection in Gujarat, Rajasthan, and Haryana industrial substations.

Deploy certified Double Mast Aerial Work Platforms for 10-metre height operations — SRE’s ISO-certified quality serving Vadodara, Gujarat, and all of India.

Get a Quote for Bulk Orders 📞 Call Now: +91 93162 08879

Technical Specifications — SRE 152 Double Mast AWP vs. Single Mast AWP: What the Specifications Mean in Practice

SpecificationSRE 152 Double Mast AWPSRE 151 Single Mast AWP
Platform Load Capacity220 kg (2 operators + tools)130 kg (1 operator + tools)
Maximum Working Height10 metres6 metres
Mast ConfigurationTwin parallel masts, bracedSingle vertical mast
Platform Stability at Max Height±5 mm under rated load±15 mm under rated load
Drive SystemBattery-powered electric (24V/300 Ah)Battery-powered electric (24V/225 Ah)
Stabiliser SystemAuto-deploy outriggers at 6m+Manual outrigger stabilisers
Machine Width900 mm770 mm
Emergency DescentManual override, battery-independentManual override, battery-independent
Load Test125% rated (275 kg at 10m)125% rated (163 kg at 6m)
PriceRs. 3,10,000 (taxes extra)Rs. 1,75,000 (taxes extra)

The 220 kg capacity of the SRE 152 is the key operational differentiator for industrial maintenance teams in Vadodara. A single operator with a standard tool kit weighs approximately 90–120 kg combined. Two operators with tools weigh 175–220 kg combined — at the rated limit. This two-person capacity enables tasks where a single operator cannot physically complete the work safely at 10 metres: structural bolt replacement (requiring one person to hold the bolt head and one to torque the nut), pipe flange disassembly (requiring two-handed work with a support partner), and large panel installations. For facilities where two-person maintenance teams are the safety standard for above-6-metre work — as required under Factory Act high-work provisions and internal EHS policies — the SRE 152 supports full compliance without restricting the team to single-operator tasks.

SRE Material Handling Equipment Pvt. Ltd. — an MSME registered, Make in India manufacturer founded in Ahmedabad in 2011 — supplies the SRE 152 to process plants, heavy engineering yards, and logistics infrastructure projects across Vadodara, Bhavnagar, Ghandhidham, Himmatnagar, Kalol, Kathwada, and Vatva in Gujarat, and nationwide to Pune, Faridabad, Gurugram, Noida, Bangalore, Chennai, Jaipur, Udaipur, Indore, and Rohtak. Pair the double mast AWP with an SRE mobile floor crane for complete elevated access and overhead lifting capability at the same facility.

Case Study — Chemical Plant Annual Shutdown Maintenance, Vadodara Petrochemicals Complex (2024):
A specialty chemicals manufacturer in Vadodara‘s Petrochemicals Complex deployed 4 SRE 152 double mast AWPs during their annual plant shutdown for overhead pipe rack inspection, heat exchanger platform maintenance, and conduit rerouting at 8–10 metre elevations. Previous shutdown used hired scaffold crews at Rs. 22,000 per crew per day × 4 positions × 12 days = Rs. 10.56 lakh. With SRE 152 AWPs operated by in-house teams, the same scope was completed in 10 days with zero scaffold hire cost. Total investment in 4 units: Rs. 12,40,000. Full capital recovery from scaffold hire elimination in the first shutdown cycle alone. From the second year, the company projects annual scaffold saving of Rs. 10+ lakh per shutdown.

Selecting Between Single Mast and Double Mast AWP — Decision Framework for Vadodara, Gujarat, and Industrial Facilities Nationwide

For purchase managers and EHS officers in Vadodara, Noida, Mangalore, and Bangalore deciding between the SRE 151 single mast and SRE 152 double mast AWP, the decision framework is: if your maximum working height requirement is up to 6 metres and one-person operation suffices, the SRE 151 at Rs. 1,75,000 is the right choice. If your requirements include any task above 6 metres, or any task at any height where two people must be on the platform simultaneously, or any task involving heavy tools (above 30 kg combined tool weight) at height — the SRE 152 at Rs. 3,10,000 is the correct selection.

Many facilities in Gujarat and across India deploy both models: SRE 151 for routine single-operator maintenance tasks at 4–6 metres (lighting, sprinkler tests, cable labelling), and SRE 152 for periodic high-work maintenance at 8–10 metres (overhead crane, roof structure, high-bay rack installation). The combined fleet — Rs. 4,85,000 for one of each — replaces scaffold hire budgets that commonly run Rs. 8–20 lakh per year for facilities with active 10-metre maintenance programmes. For compliance documentation, SRE’s ISO 9001:2015 certification and unit-specific load test certificates are accepted by State Factory Inspectorates across Gujarat, Maharashtra, Rajasthan, Karnataka, and Haryana for height equipment compliance records under Factory Act provisions. For facilities also requiring lifting of heavy components at height, the SRE chain block and hoist range integrates with overhead structures accessed by the AWP.

Procure Double Mast Aerial Work Platforms with Factory Act compliance documentation from SRE Material Handling Equipment Pvt. Ltd.

Request Bulk Order Quote 📞 Call: +91 97247 22404

Frequently Asked Questions (FAQ)

What is the rated capacity and maximum working height of the SRE 152 Double Mast AWP, and how does it compare to the single mast model?

The SRE 152 Double Mast AWP is rated at 220 kg with a 10-metre maximum working height — supporting two operators with tools simultaneously. The single mast SRE 151 is rated at 130 kg at 6 metres, suitable for one operator. The double mast design uses twin braced mast columns for ±5 mm platform stability at 10 metres under full rated load, versus ±15 mm typical for single mast designs. SRE Material Handling Equipment Pvt. Ltd.ISO 9001:2015 certified — load-tests every SRE 152 unit at 275 kg (125% rated) at 10-metre height before dispatch.

What is the price of a Double Mast AWP in Vadodara and what is included in the delivery?

The SRE 152 Double Mast AWP is priced at Rs. 3,10,000 (taxes extra) in Vadodara for the 220 kg, 10-metre standard configuration. Delivery includes the complete AWP with 24V/300 Ah deep-cycle battery, charger, auto-deploy outrigger stabilisers, full-perimeter platform guardrails, emergency manual descent mechanism, operator manual in Hindi and English, load test certificate at 125% rated capacity, and conformity declaration for Factory Act compliance records. SRE Material Handling Equipment Pvt. Ltd. delivers to Vadodara, all Gujarat GIDC zones, and nationwide.

Why does a double mast AWP provide better stability than a single mast at 10 metres, and why does this matter for maintenance tasks in Vadodara factories?

At 10-metre elevation, the cantilever bending moment on a single mast from side loads is approximately 3.5× greater than at 6 metres — requiring a much heavier mast column to maintain stability. The double mast design distributes this load across two braced columns, reducing deflection at the platform to ±5 mm under rated load. For maintenance tasks in Vadodara factories — pipe flange work, structural bolting, and conduit fitting at 9–10 metres — this stability means the operator uses both hands for the task rather than gripping the guardrail for balance, directly improving task completion speed and quality.

What is the ROI calculation for replacing scaffold hire with SRE 152 Double Mast AWPs at a Vadodara or Ahmedabad industrial plant?

The ROI model: current annual scaffold hire cost ÷ Rs. 3,10,000 unit cost. At Rs. 20,000 per scaffold day × 20 scaffold days per year = Rs. 4 lakh annual scaffold spend, the SRE 152 pays for itself in less than 10 months. For plants with annual shutdown programmes (12+ scaffold days in a single shutdown), recovery can occur within the first shutdown cycle — as demonstrated by SRE’s clients in Vadodara Petrochemicals Complex. Post-recovery, the ongoing annual saving equals the entire previous scaffold budget. SRE Material Handling Equipment Pvt. Ltd. provides a site-specific ROI model on request.

Vadodara ke heavy engineering ya chemical plant ke liye Double Mast AWP ki price aur delivery kya hai?

Vadodara ke heavy engineering aur chemical plants ke liye SRE 152 Double Mast AWP ki price Rs. 3,10,000 (taxes extra) hai — 220 kg capacity, 10 metre maximum working height. Delivery mein 24V/300 Ah battery, charger, auto-deploy outriggers, operator manual (Hindi + English), 125% load test certificate, aur conformity declaration included hai. Lead time 12–18 working days. SRE Material Handling Equipment Pvt. Ltd.ISO 9001:2015 certified — Vadodara Petrochemicals Complex aur Waghodia GIDC dono zones mein supply karta hai.

Gujarat ke high-bay warehouse ya process plant mein Double Mast AWP aur Single Mast AWP mein kaunsa select karna chahiye?

Gujarat ke facilities mein selection framework: 6 metre tak, single operator — SRE 151 Single Mast AWP (Rs. 1,75,000). 6 metre se zyada, ya 2 operators simultaneously, ya heavy tools at height — SRE 152 Double Mast AWP (Rs. 3,10,000). Many Gujarat facilities dono models deploy karte hain: SRE 151 routine tasks ke liye (4–6 metre), SRE 152 periodic high-work ke liye (8–10 metre). Combined fleet Rs. 4,85,000 mein annual scaffold hire Rs. 8–20 lakh replace kar deta hai.

Pune ya Maharashtra ke construction ya maintenance project ke liye Double Mast AWP ki delivery aur Factory Act compliance documentation kaise milegi?

Pune aur Maharashtra ke construction aur maintenance projects ke liye SRE 152 Double Mast AWP delivery 12–18 working days mein hoti hai. Factory Act compliance ke liye SRE Material Handling Equipment Pvt. Ltd. provide karta hai: unit-specific 125% load test certificate, conformity declaration, operator training manual (Hindi + English), aur safety inspection checklist. Ye documentation Maharashtra State Factory Inspectorate audits ke liye accepted hai. GST invoice aur MSME registration certificate vendor qualification ke liye available hain.

Call Us