Dual Mast Aerial Work Platform Manufacturer in Gujarat

Dual Mast Aerial Work Platform Manufacturer in Gujarat

Aerial Work

220 Kg-10 Meter (All Size Available)

Rs. 310000

(Taxes to be paid extra)

Brand: SRE
SKU: SRE 152
Min Order Qty: 1

Dual Mast Aerial Work Platform Manufacturer in Gujarat — Applications, Key Features & Industrial Supply Across India

Large industrial facilities, logistics hubs, shipyards, and commercial construction projects across Ahmedabad, Pune, and Noida frequently require two-person elevated access at heights above 6 metres — for tasks like overhead welding, pipe fitting, electrical panel installation, and heavy signage mounting that a single operator with a single mast platform cannot safely accomplish. A dual mast aerial work platform bridges this gap with a wider, stronger, and more stable elevated work solution. If you’re sourcing from a trusted Dual Mast Aerial Work Platform Manufacturer in Gujarat, SRE Material Handling Equipment Pvt. Ltd. — an ISO 9001:2015 certified manufacturer in Ahmedabad — delivers the dual mast AWP (SKU: SRE 152) with a platform load capacity of 220 kg, maximum working height of 10 metres, battery-powered dual mast lift system, priced from Rs. 3,10,000 (taxes extra), with all sizes available and minimum order quantity of 1 unit.

What Is a Dual Mast Aerial Work Platform and Why Do Large Facilities in Ahmedabad and Bangalore Choose It

Facility and project managers in Bangalore, Hyderabad, and Chennai managing large-format elevated access programmes understand that certain tasks simply cannot be completed safely by one person at 8–10 metres: overhead pipe fabrication, two-person panel lifting, elevated rigging, and double-handed welding all require a platform that provides adequate working space for two operators simultaneously. A dual mast aerial work platform uses two parallel aluminium mast columns that guide the work platform vertically — providing significantly greater platform stability at height, a wider working platform (typically 1,300 × 700 mm), and a higher load rating than a single mast system. The SRE dual mast AWP (SRE 152) delivers 220 kg load capacity at 10 metres maximum working height with the same compact battery-powered operation and narrow base footprint that makes mast-type platforms ideal for indoor industrial environments.

Construction companies, infrastructure project managers, and EPC contractors in Kutch, Bhavnagar, and Ghandhidham involved in large bay industrial buildings, port development, and power plant construction require an elevated work platform that delivers consistent structural stability at the upper end of its height range — particularly important at 8–10 metres where platform sway from wind or worker movement at height can create safety incidents. The SRE dual mast AWP addresses this through a dual aluminium mast system with precision-machined guide rollers at 600 mm intervals along both mast columns, providing platform stability tolerance of ±5 mm lateral displacement at maximum height under rated load. The battery system uses a 24V DC deep-cycle traction battery providing 6–8 hours of continuous lifting operation. SRE Material Handling Equipment Pvt. Ltd. — certified under ISO 9001:2015, registered as MSME and Make in India — load-tests every unit at 125% of rated capacity before dispatch from Ahmedabad.

When Does Your Application Need a Dual Mast AWP Instead of a Single Mast AWP

Plant engineers and procurement managers in Indore, Rohtak, and Ambala frequently ask: “We already have single mast AWPs — when should we upgrade to dual mast?” The specification trigger is clear: when the elevated task requires two workers simultaneously, when the working height exceeds 8 metres, or when the total payload (workers + tools + materials) exceeds 130 kg, a dual mast AWP is not an upgrade — it is a safety requirement. For construction projects in Maharashtra, Rajasthan, and Karnataka involving elevated MEP (mechanical, electrical, plumbing) installation at 8–10 metres, the SRE dual mast AWP (SRE 152, Rs. 3,10,000) provides the correct combination of height, load capacity, and platform size to execute two-person tasks safely and efficiently — at less than half the cost of a motorised scissor lift offering equivalent height access.

Key Applications of Dual Mast Aerial Work Platform Across Industries in Gujarat, Maharashtra, and North India

The dual mast aerial work platform is the preferred elevated access solution for two-person tasks at heights between 6 and 10 metres across India’s major industrial and construction sectors. Facility managers in Hyderabad, Chennai, Bangalore, and Noida running large manufacturing plants and logistics campuses rely on dual mast AWPs to keep maintenance operations safe and fast-moving without scaffolding dependencies. Primary applications:

  • Large Warehouse & Cold Store Maintenance (Ahmedabad, Noida, Hyderabad): Two-person overhead conveyor, racking, and structural inspection at heights up to 10 metres in high-bay logistics facilities.
  • MEP Installation on Construction Sites (Pune, Bangalore, Rajasthan): Two-person mechanical, electrical, and plumbing installation at ceiling levels of 7–10 metres during building fit-out.
  • Shipyard & Port Heavy Engineering (Bhavnagar, Kutch, Ghandhidham): Hull section welding and overhead pipe fitting requiring two operators in ship assembly and dry dock areas.
  • Power Plant & Energy Facilities (Vadodara, Jaipur, Noida): Two-person generator hall maintenance, transformer bay overhead access, and cable tray installation at heights above 6 metres.
  • Steel Structure & Fabrication (Bhavnagar, Ambala, Faridabad): Elevated bolting, grinding, and welding on large steel structure assemblies requiring two-worker access simultaneously.
  • Stadium & Arena Fit-Out (Bangalore, Hyderabad, Chennai): Two-person overhead rigging, scoreboard installation, and lighting rig assembly in large indoor arenas.
  • Airport & Railway Infrastructure (Ahmedabad, Pune, Delhi NCR): Large terminal overhead maintenance, platform canopy servicing, and overhead signage installation requiring two-person access.
  • Automotive Body Shop (Pune, Faridabad, Gurugram): Overhead conveyor track servicing, spray booth ceiling maintenance, and overhead duct installation requiring two-operator elevated access.

Technical Specifications of SRE Dual Mast Aerial Work Platform for Buyers in Rajasthan, Bangalore, and Noida

Capital procurement approvals for dual mast aerial work platforms in Bangalore, Noida, and across Rajasthan require detailed technical verification against project specifications. The SRE dual mast AWP (SKU: SRE 152) confirmed specifications: platform load capacity 220 kg (two persons plus tools); maximum working height 10,000 mm (10 metres); platform dimensions standard 1,300 × 700 mm (custom available); mast type: dual parallel aluminium extruded mast profiles; guide roller interval: 600 mm per mast; drive mechanism: 24V DC electric motor with dual rack-and-pinion synchronised lift system; battery: 24V deep-cycle traction battery; lift speed: 0.12 m/s; base footprint: 1,000 × 1,200 mm; total unit weight: approximately 480 kg; drive: manual push (standard) or motorised travel option; platform safety: 1,100 mm perimeter handrail all sides, mid-rail, toe board; tilt sensor: automatic power cut on tilt angle > 3°; emergency lowering; overload protection at 110% rated load. Starting price: Rs. 3,10,000 (taxes extra). Min order qty: 1 unit. Get a custom specification and bulk quote today.

Standard units dispatch from Ahmedabad within 15–18 working days. Custom configurations in 20–25 working days. SRE Material Handling Equipment Pvt. Ltd. covers supply to all major industrial and construction zones: Ahmedabad, Vadodara, Pune, Bangalore, Mangalore, Chennai, Hyderabad, Noida, Faridabad, Gurugram, Rohtak, Ambala, Indore, Bhopal, Jaipur, Udaipur, Bhavnagar, Kutch, Himmatnagar, Vatva, Kalol, Ghandhidham, Mahesana, and Chattral. Explore related: Mobile Scissor Lift, Mobile Floor Crane, Drum Handling Equipment. Standards: ISO Quality Standards | OSHA Elevated Work Platform Safety | Make in India Capital Goods

Why Choose SRE Material Handling Equipment Pvt. Ltd. as Your Dual Mast AWP Supplier Across Gujarat and PAN India

Project procurement teams in Mahesana, Himmatnagar, Kalol, and Chattral shortlisting dual mast AWP manufacturers in India for large project requirements consistently cite three criteria: structural build quality at upper height range (8–10 metres), documentation package for site safety records, and post-supply spare parts availability. SRE Material Handling Equipment Pvt. Ltd. delivers on all three: every unit is load-tested at 125% of rated 220 kg capacity before dispatch; the documentation package includes a load test certificate, safety checklist, and ISO 9001:2015 quality inspection record; and all aluminium mast profiles, guide rollers, battery systems, and electronic control modules are stocked at Ahmedabad for courier dispatch to any PAN India location within 48 hours of order. 📞 Call: +91 9316 208879 | +91 97247 22404 | 📧 sremhepvtltd2025@gmail.com | Get Quote Now

Related Articles

Frequently Asked Questions — Dual Mast Aerial Work Platform

Q1. What is the load capacity and maximum height of the SRE Dual Mast Aerial Work Platform?

The SRE Dual Mast Aerial Work Platform (SKU: SRE 152) carries a platform load of 220 kg — sufficient for two operators with tools — to a maximum working height of 10,000 mm (10 metres). Platform dimensions are 1,300 × 700 mm standard. Dual aluminium mast columns with guide rollers at 600 mm intervals provide lateral stability of ±5 mm at maximum height under full load. Drive system: 24V DC synchronised rack-and-pinion lift motor. Battery: 24V deep-cycle traction with 6–8 hour range. Price starts at Rs. 3,10,000 (taxes extra). Min order qty: 1 unit.

Q2. What is the price of a Dual Mast Aerial Work Platform in India and what is the delivery timeline?

The SRE Dual Mast AWP (SRE 152) starts at Rs. 3,10,000 (taxes extra) for the standard 220 kg × 10-metre configuration. Standard units dispatch from Ahmedabad in 15–18 working days. Custom platform sizes or motorised travel configurations dispatch in 20–25 working days. Minimum order quantity: 1 unit. Bulk orders of 3+ units receive priority manufacturing scheduling. SRE Material Handling Equipment Pvt. Ltd. delivers to all PAN India locations. ISO 9001:2015 load test certificate and safety checklist included with every unit.

Q3. Is the Dual Mast AWP safe for two-person elevated work at 10 metres in Gujarat and Pune construction sites?

Yes. The SRE Dual Mast AWP (SRE 152) is load-tested at 125% of rated 220 kg before dispatch. Dual aluminium mast columns with 600 mm-interval guide rollers limit lateral displacement to ±5 mm at 10 metres under full load. Platform has 1,100 mm perimeter handrail with mid-rail and toe board. Tilt sensor auto-cuts power above 3° lean. Emergency lowering function included. Overload protection at 110% rated load. SRE Material Handling Equipment Pvt. Ltd. provides a load test certificate and site safety documentation package with every unit for project compliance records in Gujarat and Pune construction sites.

Q4. How does a Dual Mast AWP compare to scaffolding for two-person tasks at 10 metres in Rajasthan and Noida?

Scaffolding at 10 metres in Rajasthan and Noida project sites requires: 3–4 workers to erect, 60–120 minutes setup time, additional materials cost, and a fixed position that cannot be relocated without complete disassembly. The SRE Dual Mast AWP (SRE 152, Rs. 3,10,000) deploys in under 5 minutes, can be repositioned at any time, requires zero erection labour beyond the operator, and returns full scaffolding cost within 2–3 months of regular use through labour savings alone. For projects with 10+ elevated tasks at varying positions, the dual mast AWP is the more productive and cost-effective option from day one.

Q5. Gujarat aur Ahmedabad ke construction projects ke liye Dual Mast AWP ka kya advantage hai?

Ahmedabad, Vatva, aur Kutch ke large industrial aur construction projects mein 10 metre tak ke elevated tasks ke liye SRE Dual Mast AWP (SKU: SRE 152, Rs. 3,10,000) best solution hai. 220 kg load — do operators ke saath tools. Setup time sirf 5 minute. Battery se 6–8 ghante kaam. SRE Material Handling Equipment Pvt. Ltd. se 15–18 working days mein dispatch. ISO 9001:2015 certified. Load test certificate included. Call karein: +91 9316 208879.

Q6. Pune aur Maharashtra ke project sites pe Dual Mast AWP ki delivery time kya hai?

Pune aur Maharashtra ke project sites ke liye Dual Mast AWP (SRE 152) dispatch Ahmedabad se 15–18 working days mein hoti hai. Custom sizes 20–25 working days. Price Rs. 3,10,000 se shuru, taxes extra. SRE Material Handling Equipment Pvt. Ltd. PAN India deliver karta hai. MSME registered — GeM portal procurement bhi possible hai government contracts ke liye. Abhi call karein: +91 9316 208879.

Q7. Dual Mast AWP ke spare parts aur service Rajasthan aur Jaipur mein kaise milenge?

Rajasthan, Jaipur, aur Udaipur ke project sites ke liye Dual Mast AWP ke spare parts — aluminium mast profiles, guide rollers, batteries, pendant controllers — Ahmedabad se courier ke zariye 48 ghante mein available hain. Annual maintenance: monthly battery check, quarterly mast rail lubrication, bi-annual guide roller inspection. Annual maintenance cost approx Rs. 5,000–10,000 per unit. Technical support: +91 97247 22404 ya sremhepvtltd2025@gmail.com.

Call Us